The build system for
3D-printed architecture

Purpose-built for turning BIM models into printed buildings. Designed for the concrete-printing era.

The Lamina dashboard — segmentation overview, reach zones, evaluation and export for a printed building

Purpose-built for printing real buildings. From a raw BIM upload to layered concrete toolpaths, every stage lives in one browser tab — no exports between tools, no reformatting.

FIG 0.2

Segmented in-browser

Open full BIM models and inspect them storey by storey — walls split for print, nothing to install.

FIG 0.3

Machines placed to reach

Position printers on the site plan with footprint, reach and pour area computed from the geometry.

FIG 0.4

Sliced into toolpaths

Layer heights, densities and patterns set per element, previewed as coloured concrete toolpaths.

Make project setup
self-driving

Turn a raw BIM upload into a print-ready project — walls segmented, machines placed, and reach zones resolved for the right printer.

2.0Configure
Lamina project configuration — segmented walls, machine placement and reach zones on the site plan

Evaluation

Stamped, like a
drawing set.

Before anything prints, Lamina reviews the model the way an engineer reviews drawings — 20 checks on the source file, 11 more on the converted geometry.

Every model leaves with one of three stamps, and an itemized report behind each.

Model evaluation

31 checks

Pre-conversion · 20

Post-conversion · 11

Accepted

Meets every rule. Conversion and slicing proceed.

With warnings

Printable, with items an engineer should review.

Rejected

Blocking issues, each failed check itemized.

Pipeline

One pipeline, drawing to concrete.

  1. 01

    Upload

    Bring the IFC, OBJ or BREP you already have.

  2. 02

    Evaluate

    31 checks decide whether the model can be printed.

  3. 03

    Slice

    Walls and slabs become layered toolpaths.

  4. 04

    Place

    Printers positioned on the site plan.

  5. 05

    Print

    Export toolpaths, then stack the concrete.

“Lamina turned our BIM handoff into a print queue. The reach checks caught wall conflicts we’d have found on-site.”
DRDana ReyesLead BIM Coordinator, VESSEL
“IFC to printable GLBs in an afternoon. The segmentation is fast and honest about what won’t print.”
MKMilan KovacHead of Fabrication, Cast Studio

Lamina powers teams turning BIM models into printed buildings.

Open the viewer

Built for the build.
Print it today.